TM 9-2320-366-20-5
(5) Connect six hoses (9) to fittings (10).
(6) Connect two hoses (11) to tee fitting (12).
(7) Pull up knob (13) on regulating valve (14) and turn fully
clockwise.
(8) Push in knob (13) on regulating valve (14).
f. Follow-On Maintenance.
(1) Connect batteries (para 7-57).
(2) Operate 30K winch and check for air leaks at pneumatic
manifold. (TM 9-2320-366-10-2).
End of Task.
17-143