TM 9-2320-366-20-4
NOTE
Left and right tubes are installed the same
way. Right side shown.
(5) Install nonmetallic bumper (8) on tool box (9).
(6) Position tube (10) on tool box (9) with four washers (11),
two screws (12), clamps (13), and self-locking nuts (14).
(7) Tighten two screws (12) to 8-10 lb-ft (11-13 Nm).
(8) Install two grommets (15) in tool box (9).
(9) Install two grommets (16) in gauge bracket (17).
(10) Position gauge bracket (17) in tool box (9) with washer
(18), screw (19), washer (20), and nut (21).
(11) Tighten screw (19) to 8-10 lb-ft (11-13 Nm).
NOTE
Left and right stiff leg access panels are
installed the same way. Left side shown.
(12) Install rubber strips (22) in tool box (9).
(13) Position two stiff leg access panels (23) in tool box (9)
with two screws (24), washers (25), and self-locking nuts
(26).
(14) Tighten two self-locking nuts (26) to 8-10 lb-ft (11-13
Nm).
16-175