TM 9-2320-366-20-4
8-8. WTEC III TRANSMISSION CONTROLS INITIAL INSTALLATION
This task covers:
a. Initial Installation
INITIAL SETUP
Equipment Conditions
Tools and Special Tools
WTEC II dashboard cable assembly removed
(para 7-10).
WTEC II cab transmission harness removed
Personnel Required
(2)
a. Initial Installation.
(1) Install WTEC III TPSS (1) in instrument panel assembly
(2).
(2) Position two brackets (3) and self-locking nuts (4) on
rear of WTEC III TPSS (1).
(3) Tighten two self-locking nuts (4) to 11-13 lb-in. (1-2
Nm).
NOTE
Preform steps (4) through (6) on vehicles
equipped with auxiliary panel.
(4) Disconnect connector J108 (5) from connector P108 (6).
(5) Disconnect connector J210 (7) from connector P210 (8).
(6) Pull auxiliary panel cable assembly (9) through forward
hole in dashboard (10).