TM 9-2320-260-34-2
16-45. TRANSFER POWER TAKEOFF REPAIR (M815, M819) (Contd)
28.
Remove two upper screws (22) and lockwashers (21) from cover (24) and housing (15). DO not discard
29.
Install bracket (23) on cover (24) and housing (15) with four washers (20), two Iockwashers (21), and
screws (22). Tighten four screws (22) 38-49 lb-ft (52-66 Nm).
30.
Position lever (18) on stud (25) and shifter rod (19) and install on stud (25) with washer (26) and
nut (28). Ensure lever (18) moves freely and aline slot in nut (28) with hole in stud (25). Tighten
nut (28) 65-130 lb-ft (88-176 Nm).
Install new cotter pin (27) in nut (28) and stud (25).
31.
32.
Place washer (17), over end of shifter rod (19) and install new cotter pin (16) in end of shifter
rod (19). Ensure shifter rod (19) moves freely.
33.
Place housing (15) in vise.
Install yoke (30) on shaft (29) with washer (31) and nut (33). Tighten nut (33) 175-350 lb-ft
34.
(237-475 Nm) alining slot in nut (33) with hole in shaft (29).
Install new cotter pin (32) in nut (33) and shaft (29).
35.
36. Remove housing (15) from vise.
16-269