TM 9-2320-260-34-2
16-47. POWER DIVIDER AND DRIVE REPLACEMENT (Contd)
NOTE
Mark flanges on power divider and drive for installation.
16. Remove six screws (7), lockwashers (6), drive (4), and gasket (2) from power divider (1). Discard
lockwashers (6) and gasket (2).
NOTE
Aline scribe marks on drive and power divider flanges if new
power divider is being installed. Ensure drain plugs face
downward.
Assistant will help with steps 1 through 8.
Position new gasket (2) on flange of drive (4).
1.
Aline key (5) of shaft (3) with keyway of coupling (8) and install drive (4) and gasket (2) on power
2.
divider (1) with six new lockwashers (6) and screws (7).
Position power divider (1) on supports and secure with safety strap.
3.
Position power divider (1) and drive (4) under vehicle.
4.
Accessing through hole in tool box floor (11), install lifting device to ring (10) of power divider (1).
5.
WARNING
All personnel must stand clear during lifting operations.
q
A swinging or shifting load may cause injury to personnel.
q Ensure Iifting capacity is greater than weight (30 lb (14 kg)) of
power divider. Failure to do so may result in injury to personnel
or damage to equipment.
6.
Raise power divider (1) to tool box floor (11) and aline holes of bracket (12) with holes of tool box
floor (11).
Install power divider (1) on tool box floor (11) with four screws (9) and nuts (13).
7.
16-274