TM 9-2320-240-34-2
16-45. TRANSFER POWER TAKEOFF REPAIR (M815, M819) (Contd)
NOTE
q Coat outer edges of base of check valves with sealing compound
before installation.
Check valves must be properly oriented to function correctly.
q
23. Install new check valves (5) in input bore (8) and output bore (4) of oil pump housing (3). Stake each
check valve (5) at three places in each bore at approximately 120 spacing. Check valve cap must
point in direction of flow.
24. Install shim (7) and plug (6) in output bore (4) of oil pump housing (3).
25, Install bushing (9) in input bore (8) of oil pump housing (3).
26.
Place spring (2) and plunger (1) in bore (10) of oil pump housing (3).
27. Install new gasket (11) and oil pump (12) on housing (15) with four new lockwashers (13), and
screws (14). Tighten screws (14) 22-28 lb-ft (30-38 Nm).
16-268