C2,TM 9-2320-211-20
at the opposite
end of the roller
procedure
2-313. Boom and Shipper Cable Roller
assembly.
(1) Vertical.
(2) L a t e r a l .
(a) R e m o v e t h e f o u r c a p s c r e w s a n d l o c k -
(a) R e m o v e t h e f o u r c a p s c r e w s a n d l o c k -
w a s h e r s securing the flange-mounted cap.
w a s h e r s securing the flange-mounted cap.
(b)Turn the mounting cap to the next set of
(b) Remove the shim from under the flange
o f the mounting cap.
holes.
NOTE
repeat the
(c) Replace the capscrews, and
The procedure in (b)above moves the shaft
procedure a t t h e o p p o s i t e e n d o f t h e r o l l e r
a n d flanged roller assemblies closer to the
assembly.
i n n e r boom, taking up excess play caused
b. Removal. Remove the six capscrews securing
by wear.
the roller frame to the boom assembly, and remove
(c) Replace the capscrews, and repeat the