TM 9-2320-366-20-5
NOTE
12 vdc load cable terminates with terminal lugs
TL172 and TL174.
12 vdc battery cable
terminates with terminal lugs TL171 and TL173.
Position terminal lugs TL171 and TL172 at the
same end.
(58) Install 21.6 in. (55.0 cm) of convoluted tubing (83) on
12vdc load cable (84) and 12vdc battery cable (85).
(59) Install plastic cable ties (80) on convoluted tubing (83).
NOTE
Position 24vdc load cable, 24vdc battery
cable, 12vdc load cable, and 12vdc battery
cable with terminal lugs TL167, TL172,
TL166, and TL171 at terminal block.
(60) Position 24vdc load cable (81) on rear side of front lifting
beam (86).
(61) Position 24vdc battery cable (82) on rear side of front
lifting beam (86).
(62) Position 12vdc load cable (84) and 12vdc battery cable
(85) on rear side of front lifting beam (86).
20-235