TM 9-2320-366-20-5
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Tools and Special Tools
Batteries disconnected (para 7-57).
Windshield wipers and nozzles removed (para
PDP cover removed (para 16-2).
Instrument panel assembly removed for
Material/Parts
access (para 7-15).
a. Removal.
(1) Remove three collars (1), nuts (2), washers (3), and
rubber washers (4) from wiper shafts (5).
(2) Remove three screws (6) and washers (7) from PDP (8).
(3) Remove three screws (9) from PDP (8).
(4) Lift PDP (8) outward to gain access.