TM 9-2320-366-20-5
This task covers:
a. Removal
d. Assembly
b. Disassembly
e. Installation
c. Cleaning/Inspection
f. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Materials/Parts (Cont)
CTIS ECU removed (para 12-6).
Antifreeze, Ethylene Glycol, Permanent (Item 12,
Auxiliary panel removed, if equipped (para 7-8).
Kick panel removed (para 16-3).
Tools and Special Tools
Materials/Parts
Dispenser, Pressure Sensitive Adhesive Tape (Item
Nut, Self-Locking (3) (Vehicle serial numbers
0001 through 3696 equipped with original
NOTE
Perform steps (1) through (25) to remove
personnel heater assembly for access.
a. Removal.
WARNING
working under vehicle due to the
possibility of falling debris. Failure to
comply may result in injury to personnel.
(1) Position drain pan under radiator drain cock (1).
(2) Open radiator drain cock (1) and drain approximately 15-
20 qt (14-19 L) of coolant from radiator (2).
(3) Close radiator drain cock (1).
Change 1