TM 9-2320-366-20-4
11-11. LOAD AVERAGING CHANNEL REPLACEMENT (CONT)
WARNING
damage your eyes.
Wear safety
contact with eyes. If sealant contacts
eyes, flush eyes with water and get
immediate medical attention. Failure to
comply may result in injury to personnel.
(3) Apply adhesive to threads of two screws (6).
(4) Position load averaging channel (7) on two load
averaging channel mounting springs (2) with screws (6).
(5) Tighten two screws (1 and 6) to 25-31 lb-ft (34-42 Nm).
(6) Apply adhesive to threads of screw (8).
(7) Position load sensing valve control cable (9) on load
averaging channel (7) with screw (8).
(8) Tighten screw (8) to 25-31 lb-ft (34-42 Nm).
c. Follow-On Maintenance.
End of Task.
11-72
Change 1