TM 9-2320-272-24-2
Connect ether supply tube (20) to ether atomizer nozzle (42).
59.
Connect connector (35) to oil pressure sending unit (34).
60.
Connect fuel supply line (36) to fuel transfer pump (37).
61.
Connect connector (39) to fuel transfer pump (38).
62.
Connect connector (41) to throttle control solenoid connector (40).
63.
Connect air line (27) to air compressor line (28).
64.
Install temperature sensor (29), new lockwasher (30), and ground strap (31) on engine (11) with
65.
washer (32) and screw (33).
Connect wire (25) to temperature sensor wire (26).
66.
Install two spacers (13) and bracket (14) on engine (11) with two washers (16) and screws (17).
67.
Install air intake tube (7) on turbocharger (10) and pipe (12) with clamps (1) and (8).
68.
Install bracket (5) and U-bolt (18) on air intake tube (7) and bracket (14) with two nuts (6).
69.
Install air intake tube adapter (4) on air intake tube (7).
70.
Install air indicator tube (2) on air intake tube adapter (4) with clamp (3).
71.
Connect tachometer cable (15) on tachometer drive (19).
72.
Secure tachometer cable (15) to air intake tube (7) with new tiedown strap (9).
73.
Install cables (24) on engine (11) with two clamps (21) and screws (22).
74.
Install new tiedown strap (23) on cables (24) and temperature sensor wire (26).
75.
4-84