TM 9-2320-272-24-2
5.
Install utility chain and lifting device on two engine lifting eyes (1).
WARNING
All personnel must stand clear during lifting operations. A
snapped cable, or swinging or shifting load, may result in injury or
death to personnel.
NOTE
Assistant will help with steps 6 and 7.
6.
Remove engine (2) from lower container section (3).
7.
Lift engine (2) onto transporter stand.
8.
Remove utility chain and lifting device from engine lifting eyes (1).
NOTE
Prepare engine for installation.
1.
Install utility chain and lifting device on two engine lifting eyes (1).
WARNING
All personnel must stand clear during lifting operations. A
snapped cable, or swinging or shifting load, may result in injury or
death to personnel.
NOTE
Assistant will help with steps 2 and 3.
2.
Remove engine (2) from transporter stand and install in lower container section (31, ensuring all
mounting holes are aligned.
3.
Remove chain and lifting device from two engine lifting eyes (1).
4-88