TM 9-2320-272-24-2
19.
Install transmission shift cable (30) on shift lever (35) with new cotter pin (34).
20.
Install transmission shift cable (30) on transmission adapter plate (33) with spacer (31), U-bolt (32),
and two nuts (29).
21.
Connect two leads (36) to neutral safety switch wires (37).
22.
Connect lead (40) to solenoid connector (39).
23.
Install modulator cable (28), clamp (26), and ground wire (25) on bracket (38) with screw (27), new
lockwasher (24), and nut (23).
24.
Connect lead (42) to transmission temperature sending unit (41).
NOTE
Wrap all male pipe threads with antiseize tape before installation.
25.
Install breather vent tube (43) on elbow (44).
26.
Connect oil cooler return hose (47) on temperature transmitter adapter (48).
27.
Connect transmission supply hose (46) on lubrication valve adapter (45).
4-79