TM 9-2320-366-20-5
20-65. LIGHT MATERIAL HANDLING CRANE (LMHC) BOOM
SHEAVE REPLACEMENT
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts
LMHC power cable removed (TM 9-2320-366-10-1).
Tools and Special Tools
a. Removal.
(1) Remove quick release pin (1) from fly section (2).
WARNING
Wear leather gloves at all times when
handling winch cable. Do not allow cable
to slide through hands even with gloves
on. Broken wires may cause injury to
personnel.
(2) Remove wire rope (3) from sheave (4).
(3) Remove self-locking nut (5), chain assembly (6), screw
(7), and washer (8) from fly section (2). Discard self-
locking nut.