TM 9-2320-366-20-5
20-64. LIGHT MATERIAL HANDLING CRANE (LMHC) BOOM
REPLACEMENT
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts
Engine shut down (TM 9-2320-366-10-1).
Tools and Special Tools
a. Removal.
(1) Remove self-locking nut (1), chain assembly (2), screw
(3), and washer (4) from fly section (5). Discard self-
locking nut.
(2) Remove sheave (6), two detent plates (7), and washers
(8) from fly section (5).
(3) Remove bushing (9) from sheave (6). Discard bushing.