TM 92320-366-20-5
This task covers:
a. Removal (All Models Except M1093/M1094)
c. M1093/M1094 Removal
b. Installation (All Models Except M1093/M1094)
d. M1093/M1094 Installation
e. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Materials/Parts (Cont)
Engine shut down (TM 9-2320-366-10-1).
Seal, Urethane Foam (102.25 in. (259.7 cm))
M1093/M1094 cab roof removed (para 16-4).
Dump switch bracket removed (para 7-146).
M1093/M1094)
Seal, Urethane Foam (36.25 in. (92.1 cm)) (Item
Tools and Special Tools
Seal, Urethane Foam (37.5 in. (95.2 cm)) (Item
Personnel Required
(2)
Materials/Parts
Seal, Urethane Foam (86.75 in. (220.3 cm)) (Item
272,
Appendix G)
(all models except M1093/ M1094)
a. Removal (All Models Except M1093/M1094).
(1) Remove six screws (1), washers (2), and defrost
cover (3) from dashboard (4).
(2) Remove six clip nuts (5) from dashboard (4).
NOTE
Note position of seals prior to removal.
(3) Remove seals (6 and 7) and two seals (8) from
defrost cover (3). Discard seals.
(4) Remove two seals (9) from defrost cover (3).
Discard seals.
Change 2