TM 9-2320-366-20-5
(10) Install two hoses (14) on winch control valve (4).
(11) Install four hoses (15) on winch control valve (4).
NOTE
Install plastic cable ties as required.
(12) Connect connectors L5 (16) and L4 (17) to winch control
valve (4)
(13) Tighten two captive screws (18) in connectors L5 (16)
and L4 (17).
e. Follow-On Maintenance.
(1) Lower dump body from maintenance position (M1090/
M1094) (TM 9-2320-366-10-1).
(2) Start engine (TM 9-2320-366-10-1).
(3) Operate 15K SRW and/or MHC and check for proper
operation and for hydraulic leaks around winch control
valve and hoses (TM 9-2320-366-10-1 or TM 9-2320-
366-10-2).
End of Task.
17-121