TM 9-2320-366-20-4
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Equipment Conditions
Tools and Special Tools (Cont)
Engine shut down (TM 9-2320-366-10-1).
Tools and Special Tools
Material/Parts
a. Removal.
(1) Pull two spring catches (1) and lift two latch levers (2).
(2) Release two latch hooks (3) from strike plates (4).
(3) Remove PDP cover (5) from dashboard (6).
(4) Remove seven screws (7) and washers (8) from kick
panel (9).
(5) Remove kick panel (9) and stiffener (10) from dashboard
(6).
NOTE
Remove plastic cable ties as required.
(6) Disconnect air duct hose (11) from kick panel (9).