TM 9-2320-366-20-4
Section II. MAINTENANCE PROCEDURES
This task covers:
a.
Mechanical Stop Removal
e. Front Angle Bracket Resilient Mount Removal
b.
Mechanical Stop Installation
f. Front Angle Bracket Resilient Mount Installation
c.
Resilient Mount Removal
g. Follow-On Maintenance
d.
Resilient Mount Installation
INITIAL SETUP
Equipment Conditions
Tools and Special Tools (Cont)
Engine shut down (TM 9-2320-366-10-1).
Crowfoot Attachment, Socket Wrench (Item 5,
Cab raised (for front angle bracket resilient mount) (TM
9-2320-366-10-1).
Tools and Special Tools
Materials/Parts
WARNING
working under vehicle due to the
possibility of falling debris. Failure to
comply may result in injury to personnel.
a. Mechanical Stop Removal.
NOTE
Both mechanical stops are removed the
same way. Right rear side shown.
Remove two self-locking nuts (1), bolts (2), and mechanical
stop (3) from frame (4). Discard self-locking nuts.
b. Mechanical Stop Installation.
NOTE
Both mechanical stops are installed the same
way. Right rear side shown.
(1) Position mechanical stop (3) on frame (4) with two bolts
(2) and self-locking nuts (1).
(2) Tighten two self-locking nuts (1) to 118-148 lb-ft (160-201 Nm).