TM 9-2320-366-20-4
(8) Close cover (13) on junction box (14).
(9) Tighten four screws (15) on junction box (14).
NOTE
Install plastic cable ties as required.
(10) Connect connector (16) to hydraulic system solenoid
(17).
c. Follow-On Maintenance.
(1) Connect batteries (para 7-57).
(2) Operate MHC and check hydraulic system operation (TM
9-2320-366-10-2).
End of Task.
7-573