TM 9-2320-366-20-4
(8) Close cover (12) on junction box (13).
(9) Tighten four screws (14) on junction box (13).
NOTE
Install plastic cable ties as required.
(10) Connect connector (15) to hoist up solenoid (16).
c. Follow-On Maintenance.
(1) Connect batteries (para 7-57).
(2) Operate MHC and check hoist up operation (TM 9-2320-
366-10-2).
End of Task.
7-569