TM 9-2320-272-24-2
3-384. HOIST WINCH CABLE REPLACEMENT (Contd)
NOTE
Direct assistant to maintain tension on hoist cable and observe
that cable is winding properly.
5.
Wind cable (4) on hoist winch drum (6) until clevis (3) end of cable (4) leaves ground.
6.
Thread cable clevis (3) through snatch block (14), over forward boom sheave (11), and back to snatch
block (14).
Remove nut (13) and anchor bolt (12) from snatch block (14) and install cable clevis (3) with anchor
7.
bolt (12) and nut (13).
8.
Install two spacers (15) on forward boom (18) with two screws (17) and new locknuts (16).
9.
Install rear cable guard (20) over rear sheaves (19) on boom (1) with four washers (21), new
10.
Raise snatch block (14) and place in stowage position (TM 9-2320-272-10).
11.
Place hoist control in NEUTRAL position and stop vehicle (TM 9-2320-272-10).