TM 9-2320-366-20-5
23-8. M1090/M1094 MANUAL OVERRIDE THREE-WAY VALVE REPLACEMENT
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts
Batteries disconnected (para 7-57).
Dispenser, Pressure Sensitive Adhesive Tape
Air tanks drained (TM 9-2320-366-10-1).
Tools and Special Tools
a. Removal.
NOTE
Tag hoses and connection points prior to
disconnecting.
(1) Disconnect two hoses (1) from 90-degree fittings (2).
(2) Disconnect hose (3) from fitting (4).
(3) Remove two self-locking nuts (5), screws (6), and
bracket (7) from support (8). Discard self-locking nuts.