TM 9-2320-366-20-5
NOTE
Terminal lugs are connected the same
way. One terminal lug shown.
Refer to Table 1 Terminal Lug
Locations and Connectors for details.
(5) Connect terminal lug TL1 (11) to distribution panel
PD1 CB10 (12).
(6) Perform step (5) on remaining terminal lugs.
Table 1 Terminal Lug Locations and Connectors
LOCATION
FUNCTION
PD
CONNECTOR
AMP
CB1
MTS SENSE
PD2
TL6
7.5A
CB2
Spare
PD2
Spare
CB3
Spare
PD2
Spare
CB4
Spare
PD2
Spare
CB5
EPLRS
PD1
TL8
10 A
CB6
DVE
PD1
TL3
7.5 A
CB7
PLGR
PD1
TL9
7.5 A
CB8
SINCGAR/FBC2
PD1
TL2
15 A
CB9
Spare
PD1
Spare
CB10
MTS PWR
PD1
TL1
20 A
Change 2
20-523