TM 9-2320-366-20-5
This task covers:
a.
Removal
c. Follow-On Maintenance
b.
Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts (Cont)
Oil, Lubricating, OE/HDO 10W (Item 43,
Tools and Special Tools
Container (30 gal (113 L) capacity)
Materials/Parts
Personnel Required
Dispenser, Pressure Sensitive Adhesive Tape (Item
(2)
a. Removal.
CAUTION
Cap or plug hydraulic connections and
of hydraulic system. Failure to comply may
result in damage to equipment.
NOTE
Tag hoses and connection points prior to
disconnecting.
(1) Remove cap (1) from hydraulic reservoir (2).
(2) Position container under drain plug (3).
(3) Remove drain plug (3) from hydraulic reservoir (2)
and drain oil.
(4) Install drain plug (3) in hydraulic reservoir (2).
(5) Install cap (1) on hydraulic reservoir (2).
Change 2