TM 9-2320-366-20-5
c. Follow-On Maintenance.
(1) Install wrecker control panel toggle switches (para 7-91).
(2) Install warning and caution placards as required (para 2-
39).
(3) Install right catwalk (para 14-4).
(4) Open hydraulic reservoir supply and return valves (TM
9-2320-366-10-2).
(5) Start engine (TM 9-2320-366-10-1).
(6) Check for oil leaks.
(7) Shut down engine (TM 9-2320-366-10-1).
End of Task.
17-91