TM 9-2320-366-20-4
11-10. LOAD SENSING VALVE AND CONTROL CABLE REPLACEMENT/ADJUSTMENT
(CONT)
(4) Remove screw (5) and load sensing valve control cable
(4) from load averaging channel (6).
b. Load Sensing Valve Control Cable Installation.
WARNING
damage your eyes.
Wear safety
contact with eyes. If sealant contacts
eyes, flush eyes with water and get
immediate medical attention. Failure to
comply may result in injury to personnel.
(1) Apply adhesive to threads of screw (1).
(2) Position load sensing valve control cable (2) on load
averaging channel (3) with screw (1).
(3) Tighten screw (1) to 25-31 lb-ft (34-42 Nm).
11-58
Change 1