TM 9-2320-366-20-4
7-92. M1084/M1086 HOIST UP LOCKOUT SOLENOID CABLE REPLACEMENT (CONT)
b. Installation.
(1) Position hoist up lockout solenoid cable (1) through
clamp (2).
(2) Position hoist up lockout solenoid cable (1) through
compression nut (3), washer (4), and connector (5).
(3) Install washer (4) and compression nut (3) on connector
(5).
(4) Tighten nut (6) on clamp (2).
(5) Install quick disconnect terminal (7) on black wire (8).
(6) Install terminal lug (9) on white wire (10).
(7) Install quick disconnect terminal (7) on ground strip (11)
position 17.
(8) Install terminal lug (9) on terminal block (12) position 28
with screw (13).
(9) Apply varnish to quick disconnect terminal (7) and
terminal lug (9).
7-460