TM 9-2320-366-20-4
(10) Close cover (14) on junction box (15).
(11) Tighten four screws (16) on junction box (15).
NOTE
Install plastic cable ties as required.
(12) Connect connector (17) to hoist up lockout solenoid (18).
c. Follow-On Maintenance.
(1) Connect batteries (para 7-57).
(2) Operate MHC and check hoist up lockout operation (TM
9-2320-366-10-1).
End of Task.
7-461