TM 9-2320-272-24-4
5-77. HINGED ROOF MAINTENANCE (Contd)
1.
Attach four chains to lifting device and hinged roof (1).
All personnel must stand clear during lifting operations. A
swinging or shifting load may cause injury to personnel.
NOTE
Assistant will help with step 2.
2.
Lift hinged roof (1) from supports and install on van body (6) with sixty-nine screws (5).
3.
Install two holding rods (4) and angle brackets (2) on hinged roof (1) with four screws (3).
4.
Remove chains from lifting device and hinged roof (1).
NOTE
Hinged roof-operated blackout circuit plungers must be installed
before side blackout harnesses are installed in load center.
5.
Install hinged roof-operated blackout circuit plungers (para. 3-377).
FOLLOW-ON TASKS:
l
l
l
Retract van body sides (TM 9-2320-272-10).
l
5-530