TM 9-2320-272-24-4
5-77. HINGED ROOF MAINTENANCE (Contd)
NOTE
Insulate entire structure with fibrous glass felt insulation.
l
Assistant will help with steps 15 and 16.
l
Install
panel (18) on hinged roof frame (1) with forty-one screws (17).
15.
Install
panel (2) on hinged roof frame (1) with fifty-five screws (10).
16.
Install
molding (15) on panels (2) and (18) with two screws (16).
17.
Install
moldings (3), (23), and (24) on panels (2) and (18).
18.
Install
three fillers (22) on panels (2) and (18) with six screws (21).
19.
Install
three bars (20) on fillers (22) with six screws (19).
20.
Install
plate (8) on panel (2) with six screws (9).
21.
Install
cover (14) on panel (2) with ten screws (13).
22.
Install
handle (12) on panel (2) with four screws (11).
23.
Install
moldings (4), (6), and (7) on panels (2) and (18) with thirty screws (5).
24.
Install
three holder assemblies (26) on hinged roof frame (1) with six screws (25).
25.
Install
three clamps (28) on hinged roof frame (1) with twelve screws (27).
26.
5-528