TM 9-2320-272-24-4
5-77. HINGED ROOF MAINTENANCE (Contd)
NOTE
Insulate areas of dissimilar metal-to-metal contact with zinc
l
chromate primer.
l Apply sealing compound to exterior joints prior to installation.
l Apply adhesive to both rubber and metal surfaces.
l Perform step 1 only if skin was removed.
l Assistant will help with step 1.
Install
skin (7) on hinged roof frame (11) with one-hundred fifty-seven new rivets (8).
1.
Install
four new grommets (10) on hinged roof frame (11) with four screws (9).
2.
Install
clevises (18) on bars (15) and (25) and position in slots of hinged roof frame (11).
3.
Install
latch (17) on hinged roof frame (11) with four washers (20) and nuts (21).
4.
Install
two clevises (18) on latch (17) with two pins (16) and new cotter pins (19).
5.
Install
new O-ring (36), new gasket (6), plate (5), and handle (3) on skin (7) with two screws (4).
6.
Install
handle (3) on latch (17) with washer (22), nut (23), and new cotter pin (24).
7.
Install
angle bracket (37) on skin (7) with three screws (38).
8.
Install
chain hook (1) and padlock and chain (2) on angle bracket (37).
9.
Install
new seals (31) and (33) on hinged roof frame (11).
10.
Install
new seal (35) and retainer (34) on hinged roof frame (11) with fifty-two new rivets (32).
11.
Install
new cushion pads (12) and (27) on hinged roof frame (11).
12.
Install
new seal (28) and retainer (30) on hinged roof frame (11) with twenty-four new rivets (29).
13.
Install
new seal (13) and hinge (14) on hinged roof frame (11) with sixty-eight screws (26).
14.
5-526