TM 9-2320-260-34-2
16-40. TRANSMISSION POWER TAKEOFF REPLACEMENT (Contd)
NOTE
Perform step 1 if studs were removed.
1. Install six studs (10) on transmission housing (14).
2. Position new gasket (13) and PTO (1) on studs (10) and transmission housing (14) and install with
NOTE
q Perform steps 3 and 4 for all vehicles except M817 and M820A2.
q Perform step 5 for M817 and M820A2 vehicles.
3. Install control lever (8) on PTO (1) with screw (9) and new locknut (5).
4. Install control lever (8) on PTO (1) with new lockwasher (6) and screw (7).
5. Install control rod (3) on PTO (1) with pin (4) and new cotter pin (2).
FOLLOW-ON TASKS: Z Install front winch propeller shaft (if so equipped) (TM 9-2320-260-20).
q Install hydraulic pump propeller shaft (M817, M820A2) (TM 9-2320-260-20).
q Install front and rear cab tunnel covers (TM 9-2320-260-20).
q Fill transmission with gear oil (LO 9-2320-260-12).
16-231