TM 9-2320-260-34-2
15-55. LIFTGATE CONTROL LINKAGE MAINTENANCE (M820A2) (Contd)
b. Disassembly
1.
Remove two nuts (5), lever (10), spring (6), and two nuts (7) from rod (8).
2. Remove lubrication fitting (9) from lever (10).
NOTE
Disassemble both connector rods.
3. Remove two nuts (24), eyebolt (25), spring (23), and two nuts (22) from rod (21).
c. Cleaning and Inspection
1.
For general cleaning instructions, refer to para. 2-8.
2. For general inspection instructions, refer to para. 2-9.
d. Assembly
NOTE
Coat all threads with lubricating oil before assembly.
q
Assemble both connector rods.
q
1. Install two nuts (22), spring (23), eyebolt (25), and two nuts (24) on rod (21).
2. Install two nuts (7), spring (6), lever (10), and two nuts (5) on rod (8).
3. Install lubrication fitting (9) on lever (10).
e. Installation
NOTE
Coat all threads and bearing surfaces with lubricating oil before
installation.
1. Install connector rod (2) on bracket (3) with pin (4) and two new cotter pins (1).
2. Install connector rod (2) on control valve eyebolt (34) with pin (38) and new cotter pin (37).
NOTE
Install both handle grips on levers.
Install handle grip (40) on lever (41).
3.
4.
Install connector link (39) on lever (26) and connector rod (2) with new cotter pin (32), washer (35),
and new cotter pin (36).
Install connector link (30) on lever (27) and control valve eyebolt (33) with nut (28), pin (31), and
5.
new cotter pin (29).
NOTE
Install both latch hooks on main frame.
6. Install latch hook (11) and two collars (12) on main frame (15) with shaft (20) and two
snaprings (14).
NOTE
Install both connector rods on latch hooks and levers.
Install connector rod (16) on latch hook (11) and lever (18) with new cotter pin (13), washer (17),
7.
and two nuts (19).
15-212