15-37. HINGED ROOF MAINTENANCE (Contd)
1. Attach two chains to lifting device and hinged roof (2).
WARNING
All personnel must stand clear during lifting operations.
A swinging or shifting load may result in injury to personnel.
Ensure lifting capacity is greater than weight (500 lb (227 kg))
of hinged roof. Failure to do so may result in injury to personnel.
NOTE
Assistant will help with step 2.
2. Lift hinged roof (2) from wooden supports and install on van body (1) with sixty-nine screws (6).
3. Install hinged roof (2) on two holding rods (5) and angle brackets (3) with four screws (4).
4. Remove chains from lifting device and hinged roof (2).
NOTE
Hinged roof-operated blackout plungers must be installed before
side blackout harnesses are installed in load center,
5. Install hinged roof-operated blackout plungers (TM 9-2320-260-20).
15-152