TM 9-2320-260-34-2
15-37. HINGED ROOF MAINTENANCE (Contd)
NOTE
q Insulate entire structure with fibrous glass felt insulation.
q Assistant will help with steps 15 and 16.
15.
Install panel (18) on hinged roof frame (1) with forty-one screws (17).
16.
Install panel (2) on hinged roof frame (1) with fifty-five screws (10).
17.
Install molding (16) on panels (2) and (18) with two screws (15).
18.
Install moldings (3), (23), and (24) on panels (2) and (18).
Install three fillers (22) on panels (2) and (18) with six screws (21).
19.
Install three bars (20) on fillers (22) with six screws (19).
20.
Install plate (8) on panel (2) with six screws (9).
21.
Install cover (14) on panel (2) with ten screws (13).
22.
23.
Install handle (12) on panel (2) with four screws (11).
Install three moldings (4), moldings (6), and moldings (7) on panels (2) and (18) with thirty
24.
screws (5).
Install three holders (26) on hinged roof frame (1) with six screws (25).
25.
26.
Install three clamps (28) on hinged roof frame (1) with twelve screws (27).
15-150