TM 9-2320-260-34-1
9-4. TRANSFER REPAIR (Contd)
119. Move shifter fork (7) under screw (8) and turn screw (8) until clearance between head of
screw (8) and shifter fork (7) is 0.006-0.010 in. (0. 15-0.25 mm). Install setscrew (6) in bore (9) and
tighten 5-15 lb-ft (7-20 Nm).
120. Coat contact surfaces of new gasket (4) with sealing compound and position gasket on housing (5).
121. Install gasket (4) and cover (3) on housing-- with four new lockwashers (2) and screws (1). Tighten
(5)
screws (1) 20-35 lb-ft (27-48 Nm).
9-56