TM 9-2320-260-34-1
9-4. TRANSFER REPAIR (Contd)
93.
Install front output flange (16) on front output shaft (17).
94.
Coat lower side of new gasket (21) with thin coat of sealing compound and position on front
cover (22).
Coat upper side of gasket (21) with thin coat of sealing compound.
95.
NOTE
Assistant will help with steps 96 and 97.
96.
Attach chain around flange (16) and lifting device and position front output shaft (17) over front
cover (22), aline driven gear in front output shaft (17) with drive gear (23) and shaft of cylinder (12)
with bore (25).
97.
Lower front output shaft housing (20), alining dowels (28) with front output cover (20), and install
on front cover (22) with ten new lock washers (19) and screws (18). Tighten screws (18) alternately
40-55 lb-ft (54-75 Nm).
Remove lifting device and chain from flange (16).
98.
Install input flange (26) on input shaft (24) with washer (27), and nut (11). Tighten nut (11)
99.
300-600 Ib-ft (407-814 Nm) and install new cotter pin (10).
100.
Install washer (15) and nut (14) on rear output shaft (6) and front output shaft (17). Tighten
nut (14) 300-600 lb-ft (407-814 Nm) and install new cotter pin (13).
9-53