TM 9-2320-260-34-1
3-26. PREPARING REPLACEMENT ENGINE FOR INSTALLATION (Contd)
3. Remove elbow (1) from air intake connector (3).
NOTE
Perform step 4 for late model engines.
4. Remove elbow (2) from air intake connector (3).
5. Remove elbow (5) from engine block (4).
6. Remove two screws (6) and bracket (14) from engine (7).
7. Remove two nuts (11), washers (10), and outer insulators (9) from front engine mount bracket (8).
Discard outer insulators (9).
NOTE
Assistant will help with step 8.
8. Remove radiator (13) and two inner insulators (12) from front engine mount bracket (8). Discard
inner insulators (12).
NOTE
Assistant will help with step 2.
1. Install two new inner insulators (12) on radiator (13).
2. Position radiator (13) on front engine mount bracket (8) and install with two new outer insula-
tors (9), washers (10), and nuts (11).
3. Install bracket (14) on engine (7) with two screws (6).
NOTE
Perform step 4 for late model engines.
4. Install elbow (2) on air intake connector (3).
5. Install elbow (1) on air intake connector (3).
6. Install elbow (5) on engine block (4).
7. Wrap threads of water temperature sending unit (18) with anti seize tape and install water tempera-
ture sending unit (18) on water manifold (15).
8. Install adapter (16) and shutoff valve (17) on water manifold (15).
3-102