TM 9-2320-260-34-1
3-18. CYLINDER HEADS REPLACEMENT (Contd)
b. Installation
NOTE
Ensure word "top" is facing up on cylinder block when installing
gasket.
1. Position new gasket (4) over dowels (5) on cylinder block (6).
2. Install cylinder head (3) on cylinder block (6) with twelve washers (2) and screws (1).
3. Tighten screws (1) in sequence shown using the following steps:
a. Tighten screws (1) 20-25 lb-fl (27-34 Nm).
b. Tighten screws (1) 80-100 lb-ft (109-136 Nm).
c. Tighten screws (1) 265-305 lb-ft (359-414 Nm).
Install fuel supply and return lines (TM 9-2320-260-20).
3-50