b. Installation.
(1) Secure the primer pump to the instrument
(2) Connect the fuel lines to the primer pump.
Section VI. DECONTAMINATION APPARATUS
3-19. Location.
The stowage location of the M11 decontamination
NOTE
apparatus for the M39 series of 5-ton, 6x6 trucks is on top
Be sure to remove all sharp corners of
bracket, if any.
A mounting bracket is fastened forward of the gear shift
lever and on the right hand side.