TM 9-2320-392-10-1
30K WINCH OPERATION - Continued
0035 00
30K WINCH OPERATION WITHOUT LOAD - Continued
9.
Remove any dirt and mud from tension indicator.
CAUTION
Cable tension must be checked prior to use. Some slack in the cable is
desired. Excessive tension can cause damage to power fairlead and cable.
Failure to comply may result in damage to equipment.
10. Position MAIN WINCH RH switch (9) to OUT.
0035 00-17