TM 9-2320-392-10-1
M1084A1/M1086A1 MATERIAL HANDLING CRANE
0030 00
(MHC) OPERATION - Continued
STOW MHC - Continued
NOTE
BOOM lever and MAST lever are operated at the same time to maintain
boom at approximately a 45-degree angle.
7.
Position BOOM lever (28) and MAST lever (29) to DOWN until mast (30) is fully
lowered.
8.
Position BOOM lever (28) to DOWN until boom (44) is fully lowered.
9.
Connect hook assembly (24) to stowage ring (25).
10. Install safety pin (26) in hook assembly latch (27).
0030 00-21