TM 9-2320-392-10-1
M1084A1/M1086A1 MATERIAL HANDLING CRANE
0030 00
(MHC) OPERATION - Continued
RAISE AND LOWER LOAD - Continued
WARNING
Ensure that there are at least five wraps of cable on hoist drum at
all times. Failure to comply may result in serious injury or death to
personnel or damage to equipment.
CAUTION
Do not lift load heavier than maximum rating for Material Handling Crane
(MHC) 5,000 lb. (2,268 kg). Failure to comply may result in damage to
equipment.
Do not allow excessive slack to build-up when paying out cable. Cable may
get tangled on drum. Failure to comply may result in damage to equipment.
Do not jerk HOIST lever. Load may bounce and cause load to separate from
hook assembly. Failure to comply may result in damage to equipment.
7.
Position HOIST lever (22) to UP to lift load.
8.
Position BOOM lever (28) to UP to lift load higher as required.
9.
Position HOIST lever (22) to DOWN to lower load.
10. Position BOOM lever (28) to DOWN to lower load further as required.
0030 00-19