TM 9-2320-392-10-1
M1090A1 DUMP COVER KIT
0028 00
INSTALLATION/REMOVAL - Continued
SOFT TOP (STEEL BOWS) INSTALLATION - Continued
60. Position shock cord (50) on right side rear flap (38) on J-hooks (47 and 51) and D-
rings (48 and 52).
61. Install shock cord (50) on four J-hooks (51) on right rear panel (53).
62. Perform steps 60 and 61 on left side rear flap.
63. Position shock cord (54) on right side front flap (37) on J-hooks (51 and 55) and D-
rings (52 and 56).
64. Hook shock cord (54) to four J-hooks (55) on front side panel (57).
65. Perform steps 63 and 64 on left side front flap.
0028 00-20