TM 9-2320-392-10-1
M1090A1 DUMP COVER KIT
0028 00
INSTALLATION/REMOVAL - Continued
SOFT TOP (STEEL BOWS) INSTALLATION - Continued
NOTE
Left and right sides of front, center, and rear bows are secured the same
way. Rear bow left side shown.
42. Position tiedown strap (4) on J-hook (14) with tri-ring (15).
43. Tighten tiedown strap (4).
44. Perform steps 42 and 43 on remaining tiedown straps.
45. Open door (33) on tool box.
46. Stow stowage strap (16) in tool box.
47. Close door (33) on tool box.
0028 00-15