TM 9-2320-366-20-5
(15) Connect three air hoses (11) to wet tank (2).
c. Follow-on Maintenance.
(1) Install pressure protection valve (para 11-29).
(2) Start engine (TM 9-2320-366-10-1).
(3) Check air hoses and wet tank fittings for leaks.
(4) Shut down engine (TM 9-2320-366-10-1).
End of Task.
23-55