TM 9-2320-366-20-5
Section II. MAINTENANCE PROCEDURES
REPLACEMENT
This task covers:
a. Hose Locations
b. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Materials/Parts
Engine shut down (TM 9-2320-366-10-1).
Dispenser, Pressure Sensitive Adhesive
Air tanks drained (TM 9-2320-366-10-1).
Tools and Special Tools
a. Hose Locations
WARNING
Wear appropriate eye protection when working under vehicle due to the possibility of falling
debris. Failure to comply may result in injury to personnel.
CAUTION
Cap or plug hose connections to prevent contamination. Failure to comply may result in damage to
equipment.
NOTE
This task shows locations of primary air supply and CTIS air hoses on the vehicle. It will not be necessary
to remove all hoses at one time.
Tag hoses and connection points prior to removal.
Note location of plastic cable ties prior to removal.
Remove plastic cable ties as required.
Inspect air hoses and fittings for cracks, kinks, nicks, stripped threads and cuts. Replace damaged parts.