TM 9-2320-366-20-5
NOTE
Install plastic cable ties as required.
(3) Position terminal lug TL168 (6) on reverse polarity relay
24V BAT terminal (7) with lockwasher (8) and nut (9).
(4) Position terminal lug TL169 (10) on reverse polarity relay
24V LOAD terminal (11) with lockwasher (12) and nut
(13).
(5) Tighten nuts (9 and 13) to 27-33 lb-ft (37-45 Nm).
(6) Position dust boots (14 and 15) on terminal lugs TL168
(6) and TL169 (10).
(7) Position terminal lug TL173 (16) on reverse polarity relay
12V BAT terminal (17) with lockwasher (18) and nut (19).
(8) Position terminal lug TL174 (20) on reverse polarity relay
12V LOAD terminal (21) with lockwasher (22) and nut
(23).
(9) Tighten nuts (19 and 23) to 108-132 lb-in. (12-15 Nm).
(10) Position dust boots (24 and 25) on terminal lugs TL173
(16) and TL174 (20).
20-273